To Do List:
1) Get HTML into the emails.
2) Finish Refactoring the Module.
3) Write the XSL script and subsequent HTML --> email loading.
Monday, March 19, 2007
Friday, March 16, 2007
2/16
Didn't get a chance to comment on the CSDL meeting wednesday.
Of especial interest was the idea of dynamic graphs, graphical data which although being displayed graphically in charts or graphs could also contain drill down abilities. Such as the pie charts, which initially represent project level statistics but when clicked upon separate into separate pie charts which represent package or module level statistics.
And yes the comet tail idea wherein a spectrum of colors in the shape of a comet tail could be representative of project level metrics.
Of especial interest was the idea of dynamic graphs, graphical data which although being displayed graphically in charts or graphs could also contain drill down abilities. Such as the pie charts, which initially represent project level statistics but when clicked upon separate into separate pie charts which represent package or module level statistics.
And yes the comet tail idea wherein a spectrum of colors in the shape of a comet tail could be representative of project level metrics.
Monday, March 12, 2007
3/12
Things currently trying to get accomplished by the end of the week.
1) Finish HTML formatting of daily project details.
2) Finish JSP page design for the interval selector class.
3) Finish alert class with respect to the getDisplayUrl method.
Will add more if i can think of anything else. Need to go into the lab tommorrow to ask questions to Hong Bing and Phillip. Also need to think of some analysis questions for the CSDL presentation on wednesday.
1) Finish HTML formatting of daily project details.
2) Finish JSP page design for the interval selector class.
3) Finish alert class with respect to the getDisplayUrl method.
Will add more if i can think of anything else. Need to go into the lab tommorrow to ask questions to Hong Bing and Phillip. Also need to think of some analysis questions for the CSDL presentation on wednesday.
Saturday, March 10, 2007
Tuesday, March 6, 2007
3/6
Went to Referentia again around 11am.
Realized that I still have both the alert class to finish writing as well as getting the interval selector jsp page to work. Hoping to finish both of these today and start on the html page design tommorrow. Hopefully dreamweaver will be able to help come up with some design flow ideas. Possibly something to talk about in next week's CSDL meeting or in the lab.
Be sure to annotate the developer guides and use cases with screenshots before friday.
Trying to get back on track with the programming schedule. As the size of the program grows there's more and more stuff to tweak and bugs to fix.
Really really need to take some time to work on unit testing this thing.
Realized that I still have both the alert class to finish writing as well as getting the interval selector jsp page to work. Hoping to finish both of these today and start on the html page design tommorrow. Hopefully dreamweaver will be able to help come up with some design flow ideas. Possibly something to talk about in next week's CSDL meeting or in the lab.
Be sure to annotate the developer guides and use cases with screenshots before friday.
Trying to get back on track with the programming schedule. As the size of the program grows there's more and more stuff to tweak and bugs to fix.
Really really need to take some time to work on unit testing this thing.
Monday, March 5, 2007
3/5
At referentia right now, working on hardcoding the data into an html file as a prototype to the dynamic html generation which will finalize the format of the emails.
Thursday, March 1, 2007
3/1
Collaboration with Referentia went well today. DailyProjectData collection is working but only in string format. Still need to port the main ProjectStatus implementation over to an Alert implementation instead of manual invocation. Also need to create the interval selector class and its associated jsp.
Must make time either monday or tuesday to go back to Referentia to do more collaboration.
Must make time either monday or tuesday to go back to Referentia to do more collaboration.
Subscribe to:
Posts (Atom)